Renewable Energy StoriesRenewable Energy Stories
  • Home
  • Solar News
    • Utility Scale
    • Rooftop Solar
    • Manufacturing
  • Other Renewables
    • Wind Energy
    • Biofuels
    • Hydro Power
    • Others
  • Storage
    • Lithium-Ion
    • Large Storage (100 kW+)
    • Small Storage
    • Battery Technology
  • Research
  • Finance
  • Events
  • Advertise
Facebook Twitter Instagram
India Edition | South East Asia Edition
Facebook Twitter LinkedIn
Renewable Energy StoriesRenewable Energy Stories
  • Home
  • Solar News
    • Utility Scale
    • Rooftop Solar
    • Manufacturing
  • Other Renewables
    • Wind Energy
    • Biofuels
    • Hydro Power
    • Others
  • Storage
    • Lithium-Ion
    • Large Storage (100 kW+)
    • Small Storage
    • Battery Technology
  • Research
  • Finance
  • Events
  • Advertise
Renewable Energy StoriesRenewable Energy Stories
Home » Masdar and EWEC Announce World’s First 24/7 Solar and Battery Project in Abu Dhabi
Battery Technology

Masdar and EWEC Announce World’s First 24/7 Solar and Battery Project in Abu Dhabi

By Lakshita Kapoor Wed, Jan 15th, 2025
Warehouse in Oman Goes Solar with No Upfront Cost
Warehouse in Oman Goes Solar with No Upfront Cost
Share
Facebook Twitter LinkedIn Pinterest Email

Masdar and Emirates Water and Electricity Company (EWEC) have announced plans for a major renewable energy project in Abu Dhabi. The initiative will combine solar power with battery storage to supply clean energy continuously, day and night. Announced during an event attended by President Mohamed bin Zayed Al Nahyan, the project represents an advancement in renewable energy technology. It was introduced by Sultan Al Jaber, Chairman of Masdar, and Mohamed Hassan Alsuwaidi, Group CEO of ADQ.

The facility will feature a 5.2-gigawatt (GW) direct current (DC) solar photovoltaic (PV) system, paired with a battery energy storage system (BESS) capable of storing 19 gigawatt-hours (GWh) of energy. This combination will enable the plant to deliver a constant supply of 1 GW of renewable energy every day. This is intended to address the challenge of solar power intermittency, ensuring reliable, around-the-clock energy delivery.

The battery storage system will allow energy generated during daylight hours to be stored and then dispatched at night or during periods of high demand. This approach enhances the stability of the grid and ensures that solar energy can be fully utilized even when the sun is not shining. Once operational, this project will be the largest integrated solar and battery storage facility ever built.

Masdar and EWEC emphasized that the project will not only accelerate clean energy deployment in the UAE but also serve as a foundation for other advanced industries, such as artificial intelligence and emerging technologies, which require stable and reliable power supplies. The development aligns with the UAE’s Net Zero by 2050 initiative and supports the UAE Energy Strategy 2050 by increasing the share of renewable energy in the energy mix.

The project is also expected to generate more than 10,000 jobs during its construction. Masdar CEO Mohamed Jameel Al Ramahi described it as the company’s most ambitious renewable energy project to date, while EWEC officials highlighted its role in ensuring energy security and supporting sustainable growth.

Abu Dhabi Battery Project BESS EWEC MASDAR solar PV
Share. Facebook Twitter Pinterest LinkedIn Tumblr Telegram Email
Lakshita Kapoor
  • Website

Related Posts

China’s Almaden Plans New Solar Glass Factory in Abu Dhabi

May 8, 2025

Iraq Plans to Expand Solar Energy In Multiple Provinces

May 6, 2025

Scatec Begins Work on Egypt’s First Solar and BESS Project

May 6, 2025

Leave A Reply Cancel Reply

two × 2 =

Latest News
  • ACWA Power Expands RE in China, Saudi Arabia, and Beyond
  • Jordan Aims to Reach RE Target Earlier Than Planned
  • China’s Almaden Plans New Solar Glass Factory in Abu Dhabi
  • BYD Ships First Batch of Energy Storage Units to Saudi Arabia
  • Sun, Wind and Bids, Iraq Goes Renewable
Solar News

China’s Almaden Plans New Solar Glass Factory in Abu Dhabi

May 8, 2025

Iraq Plans to Expand Solar Energy In Multiple Provinces

May 6, 2025

Scatec Begins Work on Egypt’s First Solar and BESS Project

May 6, 2025

Sembcorp Operationalize 588MWp Solar Power Plant In Oman

May 5, 2025
ADVERTISE WITH US

We are the no.1 B2B solar media in India. With SaurEnergy, you have a full menu of options to pick from to reach the largest audience for your products and services.

To get in touch, contact us at info[at]saurenergy.com

Or Call at 9891147599 / 8802315631

Facebook Twitter Instagram YouTube LinkedIn WhatsApp
Latest News
  • ACWA Power Expands RE in China, Saudi Arabia, and Beyond
  • Jordan Aims to Reach RE Target Earlier Than Planned
  • China’s Almaden Plans New Solar Glass Factory in Abu Dhabi
  • BYD Ships First Batch of Energy Storage Units to Saudi Arabia
  • Sun, Wind and Bids, Iraq Goes Renewable
SAURENERGY NEWSLETTER

Subscribe to Updates

Get the latest creative news from FooBar about art, design and business.

    [mc4wp_checkbox]

    © 2025 Saurenergy International.

    Type above and press Enter to search. Press Esc to cancel.

    Newsletter Subscription

      [mc4wp_checkbox]